REFERENCES
| Company | Project title |
| Cestné stavby a.s. Lučenec | Assorting line I, II |
Investor: Cestné stavby a.s. Lučenec
Project title:Assorting line I, II
Place: Husina
Degree of technical documentation: PRS
Project development: 09/2002
Project realization: 11/2002
Project activity - solved
- Building situation
- Attendant report
- Technical report
- Static analysis
- Documentation of process equipment of the building
| Rudex spol. s.r.o. | Bentonite production |
Investor: Rudex s.r.o. Bratislava
Project title: Bentonite production
Place: Spišská Nová Ves
Degree of technical documentation: PRS
Project development: 11/2002
Project realization: 11/2008
- Construction management
- Attendant report
- Total technical report
- Static expertise report
- Total building situation
- Building and engineering structure
- Technological installations
- Document assembly
| Kabe s.r.o. | Technological line for dolomite limestone treatment |
Investor: Kabe, s.r.o.
Project title: Technological line for dolomite limestone treatment
Place: Horná Mičiná
Degree of technical documentation: Feasibility study
Project development: 05/2003
Project activity - solved
Process layout
| MONOPRIX s.r.o. | Hall of the green mass storing and treatment |
Investor: MONOPRIX, s.r.o. Bratislava
Project title: Hall of the green mass storing and treatment
Place: Plavnica
Degree of technical documentation: PSP
Project development: 04/2004
Project realization: 10/2004
- Fire project
- Building project - conversions
- Project of technology
| Micro Juntas SK s.r.o. | Gasket production |
Investor: Micro Juntas SK s.r.o.
Project title: Gasket production
Place: Spišská Nová Ves
Degree of technical documentation: PSP
Project development: 06/2004
Project realization: 11/2004
- Building permission
- Building approval procedure
- Occupancy permit of building
- Attendant report
- Total technical report
- Fire safety solution
- Total situation
- Documentation of building technological installations
- Documentation of heavy-current wiring
- Documents and enclosures
| Periclase Technologies GmbH | Preheater |
Investor: Periclase Technologies, GmbH
Project title: Preheater
Place:
Degree of technical documentation: development + production documentation
Project development: 07/2004
- Machine development
- Production documentation
| Triplus SK s.r.o. | Plastics production |
Investor: Triplus SK, s.r.o
Project title: Plastics production
Place: Spišská Nová Ves
Degree of technical documentation: PRS
Project development: 09/2004
Project realization: 11/2004
- Building permission
- Building approval procedure
- Occupancy permit of building
- Fire building estimation
- Building project – conversions
- Project - Water - Canalization
- Project - Gas
- Project - Heating
- Project of technology
- Project - Electro
| Kollárová s.r.o. | Brushes production |
Investor: KOLLÁROVÁ, s.r.o.
Project title: Brushes production
Place: Spišská Nová Ves
Degree of technical documentation: PSP
Project development: 10/2004
Project realization: 05/2005
- Building permission
- Building approval procedure
- Occupancy permit of building
- Attendant report
- Total technical report
- Fire safety solution
- Total situation
- Documentation of building technological installations
- Documentation of heavy-current wiring
- Documents and enclosures
| CRW Slovakia s.r.o. | CRW Slovakia – production of plastics products |
Investor: CRW Slovakia, s.r.o.
Project title: Plastics productioných výrobkov
Place: Industry park Spišská Nová Ves
Degree of technical documentation: PSP
Project development: 03/2005
Project realization: 06/2006
- Building permission
- Building approval procedure
- Occupancy permit of building
- Construction management
- Attendant report
- Total technical report
- Fire safety solution
- Static analysis of crane grappling
- Total building situation
- Documentation of buildings and underground services
- - SO 101 Cooling tower footing
- Documentation of technological installations
- - PS 201 Technology of production
- - PS 202 Interior heavy current wiring
- Document assembly
| STROJMONT, spol. s.r.o. | Workshops – engineering production |
Investor: STROJMONT, spol. s.r.o.
Project title: Workshops – engineering production
Place: Spišské Podhradie
Degree of technical documentation: PSP
Project development: 05/2005
Project realization: 10/2007
- Building permission
- Building approval procedure
- Attendant report
- Total technical report
- Fire safety solution
- Total building situation
- Documentation of buildings and underground services
- Documentation of technological installations
- Document assembly
| INVESTCOM Slovakia s.r.o. | Plate carrier |
Investor: INVESTCOM Slovakia, s.r.o.
Project title: Plate carrier
Place: Spišská Nová Ves
Degree of technical documentation: development + production documentation
Project development: 07/2005
Project realization: 08/2005
- Production management
- Machine development
- Production documentation
| Rudolph Usinados SK, s.r.o. | Workshops – engineering production I. stage |
Investor: RUDOLPH USINADOS SK, s.r.o.
Project title: Workshops – engineering production I. stage
Place: Spišská Nová Ves
Degree of technical documentation: PSP
Project development: 01/2006
Project realization: 05/2006
- Building permission
- Building approval procedure
- Occupancy permit of building
- Construction management
- Attendant report
- Total technical report
- Fire safety solution
- Total building situation
- Architectonic and constructional solution
- Water distribution and waste
- Central heating and boiler room
- Project manual
- Electro-processing equipment
| Micro Juntas SK s.r.o. | Workshop – gasket production |
Investor: MICRO JUNTAS SK, s.r.o.
Project title: Workshop – gasket production
Place: Spišská Nová Ves
Degree of technical documentation: PSP
Project development: 04/2006
Project realization: 10/2006
- Building permission
- Building approval procedure
- Occupancy permit of building
- Construction management
- Attendant report
- Total technical report
- Fire safety solution
- Total building situation
- Architectonic and constructional solution
- Fire flow distribution
- Project manual
- Electro-processing equipment
| Rudolph Usinados SK, s.r.o. | Workshops – engineering production II. stage |
Investor: RUDOLPH USINADOS SK, s.r.o.
Project title: Workshops – engineering production II. stage
Place: Spišská Nová Ves
Degree of technical documentation: PSP
Project development: 04/2006
Project realization: 10/2006
- Building permission
- Building approval procedure
- Occupancy permit of building
- Construction management
- Attendant report
- Total technical report
- Fire safety solution
- Total building situation
- Architectonic and constructional solution
- Water distribution and was
- Central heating and boiler room
- Project manual
- Electro-processing equipment
| NPLS, s.r.o. | Industry park Zlaté Moravce |
Investor: NPLS, s.r.o.
Project title: Industry park Zlaté Moravce, Manufacturing factory NPLS
Place: Industry park Zlaté Moravce
Degree of technical documentation: PSP
Project development: 05/2006
Project realization: 05/2007
- Attendant and technical report
- Project of technology
| EUROWAY s.r.o. | Road transport Smižany |
Investor: EUROWAY, s.r.o.
Project title: Road transport Smižany
Place: Smižany
Degree of technical documentation: Feasibility study
Project development: 09/2006
- Attendand and technical report
- 3D view
- Situation
- Ground floor plan
- Floor plan
- Lengthwise section
- Cross cut AB
- Cross cut - hall
| UNITED MORE s.r.o. | Factory UNITED MORE - Vrbové |
Investor: UNITED MORE, s.r.o.
Project title: Factory UNITED MORE - Vrbové
Place: Vrbové
Degree of technical documentation: PÚK
Project development: 10/2006
- Landscape proceeding
- Attendant report
- Total technical report
- Fire safety solution
- Static analysis of building
- Total building situation
- Documentation of buildings and underground services
- Documentation of building technological installations
- Survey, document assembly
| SLOVMAG a.s. Lubeník | Preheater of burden |
Investor: SLOVMAG a.s. Lubeník
Project title: Preheater of burden
Place: Lubeník
Degree of technical documentation: PRS
Project development: 06/2007
- Attendant report
- Total technical report
- Fire safety solution
- Static analysis of building
- Total building situation
- Documentation of buildings and underground services
- - SO 100 Steel construction of preheater
- Documentation of technological installations
- - PS 100 Technological procedure
- - PS 200 Electrotechnical equipment
- - PS 300 Instrumentation
- Document assembly
| WIDOS, s.r.o. | Production hall |
Investor: WIDOS, s.r.o.
Project title: Production hall
Place: Spišská Nová Ves
Degree of technical documentation: PSP
Project development: 08/2007
Project realization: 11/2007
- Building permission
- Building approval procedure
- Attendant report
- Total technical report
- Fire safety solution
- Static analysis of building
- Total building situation
- Documentation of buildings and underground services
- - SO 100 - Ready-built hall
- - SO 200 - Communication pipe and water line of premises of factory
- Documentation of technological installations
- - PS 100 - Technological procedure
- - PS 200 - Electrotechnical equipment
- - PS 300 - Central heating
- Document assembly
| Hutnícka fakulta TU Košice | Rotačný vzorkovač RV-01 |
| ROVA SK s.r.o. | Production hall - ROVA SK |
Investor: ROVA-SK, s.r.o.
Project title: Production hall - ROVA-SK
Place: Spišská Nová Ves
Degree of technical documentation: PSP
Project development: 11/2007
Project realization: 09/2008
- Building permission
- Building approval procedure
- Occupancy permit of building
- Attendant report
- Total technical report
- Fire safety solution
- Static analysis of building
- Total building situation
- Documentation of buildings and underground services
- - SO 100 Hall of dividing
- - SO 200 Storage shed
- - SO 300 Production hall of trapeze sheets utill 35 mm
- - SO 400 Production hall of trapeze sheets utill 150 mm
- - SO 500 Water distribution
- Documentation of building technological installations
- - PS 100 Technological part
- - PS 200 Gas distribution and heating
- - PS 300 Electrotechnical equipment
| Faculty of Mining The Technical University of Košice | Pilot facility – Dolomita -II. stage |
Investor: VRL Fakulta BERG TU v Košiciach
Project title: Pilot facility – Dolomita -II. stage
Place: SMZ Jelšava
Degree of technical documentation: PSP, PRS
Project development: 03/2008
Project realization: 03/2009
- Attendant report
- Total technical report
- Fire safety solution
- Total building situation
- Documentation of buildings and underground services
- - SO 100 Building conversion
- Documentation of technological installations
- PS 100 Technological procedure
- PS 200 Electrotechnical equipment
- PS 300 Instrumentation
- PS 400 Gas distribution
- Document assembly
| Faculty of Mining The Technical University of Košice | High-speed rotary calciner |
Investor: Faculty of Mining The Technical University of Košice
Project title: High-speed rotary calciner
Place: Košice
Degree of technical documentation: PSP, development + production documentation
Project development: 03/2008
Project realization: 03/2009
- Machine development
- Production documentation
- Attendant report
- Total technical report
- Total building situation
- Documentation of buildings and underground services
- - SO 100 Plotting the situation
- Documentation of building technological installations
- - PS 100 Technological part
- - PS 200 Electrotechnical equipment
- - PS 300 Instrumentation
- - PS 400 Gas
- Document assembly
| Faculty of Metallurgy The Technical University of Košice | Viscosimeter |
Investor: Faculty of Metallurgy The Technical University of Košice
Project title: Viscosimeter
Place: Košice
Degree of technical documentation: development + production documentation
Project development: 06/2008
Project realization: 03/2009
- Machine development
- Production documentation
| EMERSON a.s. | Test line UPS |
Investor: EMERSON, a.s
Project title: Test line UPS
Place: Nové Mesto nad Váhom
Degree of technical documentation: PRS, PSP, Feasibility study
Project development: 09/2008
Project realization: 03/2009
- Attendant report
- Total technical report
- Fire safety solution
- Static analysis of building
- Total building situation
- Documentation of buildings and underground services
- SO01 Trafo station
- SO02 Production hall DEAS
- SO03 Outbuilding pre LOAD BANKY
- Documentation of building technological installations
PS01 Technological part PS02 Trafo station Heavy current distribution PS03 Production hall elektro Heavy current distribution PS04 Generator Heavy current distribution PS05 Automated control system
| Confal a.s. | AL granulate dressing |
Investor: Confal, a.s.
Project title: AL granulate dressing
Place: Banská Bystrica
Degree of technical documentation: PRS
Project development: 03/2009
Project realization: 09/2009
- Building approval procedure
- Occupancy permit of building
- Building permission
- Attendant report
- Total technical report
- Fire safety solution
- Total building situation
- Documentation of buildings and underground services
- - SO 010 Hall of AL waste – spot item
- - SO 020 Hall of AL mixture – spot item
- Documentation of building technological installations
PS 100 Process equipment –Hall of AL waste DPS 110 Assorting line of general AL waste DPS 120 Crushing line of AL waste PS 200 Process equipment – Hall of AL mixture DPS 230 Crushing line of AL granulate DPS 240 Mixing line of AL mixture DPS 250 Briquetting line PS 300 Process distribution VZT DPS 320 Crushing line of aluminium waste - dedusting DPS 330 Crushing line of AL granulate - dedusting DPS 340 Mixing line of AL mixture - dedusting PS 400 Wiring SO 010 a SO 020 PS 500 Connection of process equipment SO 010 a SO 020 PS 600 Trafo station - NN distributor 1.and 2.field –Revision